Cork

ORK-A

Little Island, Cork, Ireland

Data center coming soon

Cork, Ireland

18.7
MW
TOTAL CRITICAL IT
35K
SF
M2
WHITESPACE

ORK-A Cork: Ready for Service Q3 2027

Metrobloks is developing a three-building data center campus at Little Island, Cork, anchored by a completed 85,163 sq ft cold shell. DC1 combines a 9.5 MVA grid import with 15.75 MW of on-site gas generation to deliver 18.7 MW of Critical IT from Q3 2027, with rack positions above 200 kW designed for next-generation GPUs. Private secure suites are available in the multi-tenant buildings.

Dublin has been closed to new data center grid connections since 2021, and national policy now steers new capacity to regions like Cork — Ireland's second city, home to over 200 multinationals and more than 5 GW of planned offshore wind. ORK-A serves Ireland, the UK and Western Europe: approximately 12 million people live within 250 miles, and an estimated 130 million are reachable within 20 milliseconds round trip.

Superior Connectivity and Resilient Design 

  • Five fibre providers on site via two diverse routes, with 2.9 ms round trip to Dublin.
  • 9.5 MVA grid import from the Castleview 110 kV station across from the site, with 3.9 MVA temporary power live today.
  • On-site gas generation licensed for 24/7 prime power, with full planning consent across DC1 to DC3.
  • The 700 MW Celtic Interconnector lands 7 miles away, adding direct fibre to France from Q4 2028 at an estimated 6 ms round trip.
  • Flood Zone C, built on limestone bedrock.

Dublin is full. Cork is open.

  • Cork is Ireland's second city, home to over 200 multinationals.
  • Dublin has been closed to new data center grid connections since 2021.
  • Fed from the Castleview 110 kV station directly across from the site.
  • Flood Zone C, built on limestone bedrock.

Engineered for Next-Generation Compute

Hybrid power built for density

DC1 pairs a 9.5 MVA grid connection with 15.75 MW of on-site gas generation, allocatable to DC1 or across DC1 and DC2. The design supports rack positions above 200 kW on a 1.35 PUE basis, with hybrid direct liquid and air cooling tailored to each deployment.

Delivered in phases across a 22-acre freehold campus

Capacity comes in increments of 1.5 or 2 MW IT, with block or distributed redundancy and a 400 V AC or 800 V DC architecture. DC1 delivers 18.7 MW of Critical IT from Q3 2027. DC2 adds 7.0 MW by Q2 2028 on a fully consented 99,077 sq ft site, and DC3 adds approximately 74 MW from 2029, taking the campus to roughly 100 MW at full build-out.

Campus Specs

Critical IT:
18.7 MW
Campus Size:
22 acres
Data Halls:
TBD
Configuration:
3 Buildings — DC1 built, DC2 and DC3 fully consented
Whitespace:
35,000 Total Square Feet
Availability:
Designed to Tier III+
Connectivity:
Carrier neutral, five fibre providers on site
Power Density:
TBD
Cooling:
Direct liquid (DLC) and air, tailored to customer
Sustainability:
Over 5 GW of planned offshore wind in the region
UPS:
Central or customer-racked UPS
Power config:
400 V AC or 800 V DC
Generators:
On-site gas generation licensed for 24/7 prime power
Mechanical:
TBD

Ireland's Natural Second Market

Low-latency reach to an estimated 130 million people within 20 ms
Five fibre providers on site via two diverse routes
Hybrid grid and on-site gas power, licensed for 24/7 prime power
Dublin closed to new data center grid connections since 2021

Secure European Capacity That Can Deliver in 2027

DC1 delivers 18.7 MW of Critical IT from Q3 2027, the first phase of a 22-acre campus with full planning consent across all three buildings. The phased roadmap allows customers to secure capacity now and scale as DC2 and DC3 come forward, without relocating or redesigning infrastructure.

Secure European Capacity That Can Deliver in 2027

DC1 delivers 18.7 MW of Critical IT from Q3 2027, the first phase of a 22-acre campus with full planning consent across all three buildings. The phased roadmap allows customers to secure capacity now and scale as DC2 and DC3 come forward, without relocating or redesigning infrastructure.

Secure AI Capacity

Speak with a Metrobloks colocation specialist to discuss AI, HPC, and high-density deployment options.